HotelInfantesAgres - Bawat tanong, may sagot. Logo

In Math / Senior High School | 2025-07-24

if 7 men can do a job in six days. how many men can do the work in 3 days

Asked by fyya1688

Answer (1)

Answer:14 menStep-by-step explanation:We will assume that these men work at the same pace on all jobs.  Let's calculate a rate, Jobs/man*day.  We are told that 7 men can complete 1 job in 6 days.  The rate would be:  Jobs = 1  Time = 7 men over 6 days or 42 man*daysThe rate is (1 Job)/(42 man*days)The relationship between jobs, men and days is:   Jobs = Rate*Men*Days  How many men can do the 1 job in 3 days may be calculated by entering the information into the above equation:     Jobs = Rate*Men*Days   Jobs = 1   Rate = (1 Job)/(42 man*days)   Days = 3   Men = the unknown, which we'll call x here.     Jobs = Rate*Men*Days     Jobs = Rate*x*Days      1 Job = [(1 Job)/(42 man*days)]*x*(3 days)     Let's cancel units, where possible      1 Job = [(1 Job)/(42 man*days)]*x*(3 days)      1  = [(1 )/(42 man]*x*(3)       x = 14 men      

Answered by rspill6 | 2025-07-24