1. A construction worker is working on a wall that requires different sectionsto be painted. For the first section, he painted 4/15 of the wall. For thesecond section, he painted 7/15 of the wall, and for the third, he paintedthe 1/15 of the back wall. How much of the wall has he painted in total?
Asked by merrysgamboa
Answer (1)
• 4/15+7/15+1/15= 4+7+1 = 12/15 if lowest term = 4/5